Q2 Metals Drills 120.3 M at 1.72% Li2O including 19.0 M at 2.06% in First Assays Reported from its Spring 2024 Drill Campaign at the Cisco Lithium Property, James Bay, Quebec, Canada
Highlights: Strong analytical results from the inaugural drilling campaign for Q2 Metals including: CS-24-010: Cumulatively 181.1 metres (“m”) at 1.67% Li2O Widest interval of 120.3 m at 1.72% Li2O including 19.0 m at 2.06% Li2O CS-24-007: Cumulatively 94.6 m at 1.52% Li2O Widest interval of 27.1 m at 1.96% Li2O including 11.1 m at 2.49% […]

















